Project Size: | 96.8 MW |
---|---|
Location | Jivapar, Amreli |
Highlights | Total BOP Development on turnkey basis |
Client | Siemens Gamesa Renewable Energy |
96.8 MW
200 MW
Project Size: | 200 MW |
---|---|
Location | Kutchh |
Highlights | Development 33 KV Network Development on turnkey basis |
Client | Alfanar Power Private Ltd. |
200 MW
Project Size: | 200 MW |
---|---|
Location | Kutchh |
Highlights | Development Land & Pathway Development on turnkey basis |
Client | VISH WIND INFRASTRUKTURE LLP |
Sr. No. | Name of Client | Name of Works | (In Project Value Lacs) | Project DateCommencement | Project Completion Date |
1 | M/s Ujaas Energy Limited – Ahmedabad | Designing, Engineering, Supply, Erection, Testing and Commissioning Including Civil Work of Hybrid 66/11 KV , 12.5 MVA Power X’mer including 2.25 MVA , 11/0.433 KV Station X’mer for SSNL Canal Top Solar Project on Partly Turnkey Basis. | 216.29 | 21.04.2016 | 03.05.2017 |
2 | M/s Nandan Denim Limited -Ahmedabad | Supply & Erection of 66/11 KV Substation at Nandan , Bareja Site. | 67.00 | 12.07.2016 | 02.01.2017 |
3 | M/s Nandan Denim Limited –Ahmedabad | Designing, Engineering, Supply, Erection, Testing & Commissioning of 1×66 KV Feeder Bay at GETCO’s 66/11KV Barejadi S/S including civil works & 66 KV S/C Line with ACSR Dog Conductor on D/C Panther Tower & Laying of 66KV Single Core (3+1 Spare) 300Sq.mm XLPE Power Cable from existing 66KV Barejadi S/S to 66KV Nandan Denim Limited S/S on Turnkey Basis. | 588.33 | 12.07.2016 | 02.01.2017 |
4 | M/s Inox Wind Infrastructure Services Limited | Design, Engineering, Supply, Erection & Civil work for 66/33 KV 1×35 MVA Transformer Substation at Wind firm site Vill- Chhapadi, Ta- Savarkundala, Dist – Amreli | 368.81 | 01.09.2016 | 27.03.2017 |
5 | M/s Inox Wind Infrastructure Services Limited | Design, Engineering, Supply, Erection & Civil work for 66KV Bay at GETCO’s 66KV Vijapadi S/S. | 37.03 | 01.09.2016 | 27.03.2017 |
6 | The Superintending Engineer (TR) Gujarat Energy Transmission Corporation Limited – Amreli |
Work of Erection, Testing & Commissioning of 66KV D/C LILO Panther Tower Line to 66KV Sanes SS from 66KV Vallabhipur – Nari Road Tower Line on Panther Conductor Ta/Dist – Bhavnagar ( Approx. Line Length -6.0 RKM) | 93.13 | 07.10.2016 | 27.09.2017 |
7 | M/s Inox Wind Infrastructure Services Limited | Supply, Erection and stringing of 66KV D/C Vijapadi – Inox wind firma line on ACSR Panther Conductor | 133.83 | 25.12.2016 | 27.03.2019 |
8 | M/s Acecon Vitified Pvt Ltd. | Designing, Engineering, Supply, Erection, Testing & Commissioning of (1) 66/11 KV – 1 X 7.5 MVA Power Transformer & 11/0.430 KV – 1 x 3000 KVA, 11/0.430 KV – 1 x 2500 KVA, 11/0.430 KV – 2 x 2250 KVA Station Transformer along with all associated 66/11 KV switchyard equipment at M/s. Acecon Vitrified Pvt. Ltd. Located at Vill. – Matel, Ta -Wankaner & Dist – Morbi (2) 1 x 66 KV Feeder Bay at GETCO’s 66/11 KV Lakaddhar -I S/S including civil works & (3) 66KV D/C Tower Line From Existing 66KV Lakaddhar-I SS to Proposed M/S Acecon Vitrified Pvt Ltd SS on Panther Tower with ACSR Dog Conductor on Turnkey Basis. |
259.89 | 29.11.2016 | 20.02.2017 |
9 | M/s Inox Wind Infrastructure Services Limited | Design, Engineering, Supply, Erection & Civil work for 66/33 KV 1×35 MVA Transformer Substation at Wind firm site Vill- Vanda, Ta- Savarkundala, Dist – Amreli | 600.00 | 05.01.2017 | 23.09.2017 |
10 | M/s Inox Wind Infrastructure Services Limited | Design, Engineering, Supply, Erection & Civil work for 66KV Bay at Nearby GETCO’s 66 KV Vanda SS | 600.00 | 09.01.2017 | 23.09.2017 |
11 | M/s Inox Wind Infrastructure Services Limited | Supply, Erection and stringing of 66KV D/C Vanda – Inox wind firma line on ACSR Panther Conductor | 600.00 | 03.06.2017 | 23.09.2017 |
12 | M/s Powerica Limited | Proposed 66 KV S/C Line from Existing GETCO’s 66 KV Khambhaliya S/S to Proposed 66 KV M/s Powerica Limited Bhatel S/S on Panther Tower/DP/UG cable with ACSR Panther Conductor. | 677.07 | 06.07.2017 | 17.08.2018 |
13 | The Superintending
Engineer (TR) |
Erection, Testing, Commissioning, Earthing, Yard Lighting, etc. work of 100MVA 220/66KV Transformer Bay & 66KV Bus Strengthing Work at 220KV Moti Paneli Substation. | 10.64 | 27.03.2016 | Work under Progress |
14 | The Superintending
Engineer (TR) |
Erection, Testing, Commissioning, Earthing, Yard Lighting, etc. work for 220/66KV 100MVA Transformer -4 Bay, 220/132 KV Transformer Bay ( 2Nos.), 132 KV Line Bay (2No.) And 220KV Bus Extension work and 66KV Bus Strengthing work at 22KV Visavadar Substation | 34.24 | 01.04.2016 | Work under Progress |
15 | The Superintending
Engineer (TR) |
Erection of 220/132kV Transformer bay, conversion of 132 & 66kV Bus from single ACSR Zebra conductor to Twin Zebra ACSR conductor & other associated work at 220kV Ranavav S/s | 16.87 | 01.05.2016 | Work under Progress |
16 | The Superintending
Engineer (TR) |
Erection, Testing, Commissioning, Earthing, Yard Lighting, etc. work for 220/66KV Bus extension and Transformer Bay for Augmentation 160MVA 220/66KV Transformer & 66KV Bus Strengthing at 220KV Keshod Substation. | 11.45 | 01.05.2016 | Work under Progress |
17 | The Chief Engineer (P) Gujarat Energy Transmission Corporation Limited – Baroda |
Supply, Erection, Testing & Commissioning of 220 KV D/C Pirana- Barejadi line with AL-59 Equivalent weight of ACSR Zebra Conductor – 22.48 Km on Turnkey Basis | 1174.99 | 28.12.2016 | Work under Progress |
18 | The Superintending
Engineer (TR) |
Work of Erection & Commissioning of 01 No 220/66 KV Transformer Bay with associated structure, equipment’s, gantry, bus bar stringing Jumpering, C&R panel, control wiring & earthing etc. at 220 KV Zaghadia Substation. | 15.79 | 21.09.2017 | Work under Progress |
19 | M/S. SURYA ROSHANI LIMITED. | An Estimate for 4000 KVA additional demand ( CD raise from 3000 to 7000 KVA) power supply at 66KV supply voltage in respect of M/S SURYA GLOBAL STEEL TUBE LIMITED. (Con No – 31537) at Village – BHUVAD, Taluka – Anjar, Dist – Kutch – 370001 under HTP-1 Tariff., WORK INLCUDING NEW LINE, HOT LINE & UG CABLE | 820.38 | 21.12.2017 | Work under Progress |
20 | The Superintending Engineer (TR), Gujarat Energy Transmissions Corporation Ltd. – Bharuch |
work of erection of 01 No 220/66KV 160MVA transformer bay with associated structure, equipment, gantry, bus bar stringing, Jumpering, C&R panel, control wiring & earthing etc. at 220 KV Achhalia Substation. | 22.12 | 06.04.2018 | Work under Progress |
21 | M/s Utkarsh Ispat Limited – Rajkot | Supply, Erection, Testing & Commissioning of 66/11 KV Substation, 66 KV 300 Sq. mm UG Cable and GETCO end Feeder Bay on turnkey basis | 219.93 | 04.05.2018 | Work under Progress
` |
22 | M/s Petronet LNG Limited | Installation & Commissioning of Transformer and supply of it’s associated accessories at Petronet LNG Limited – Dahej | 306.81 | 26.08.2018 | Work under Progress |
23 | The Chief Engineer (P) Gujarat Energy Transmission Corporation Limited – Baroda |
Erection, Testing and Commissioning of all 220 KV & 66KV Substation equipment’s provided by GETCO and supply of minor items/hardware materials excluding civil works, C&P Panels and SCADA for 220 KV Bagodara S/S. | 639.33 | 27.08.2018 | Work under Progress |
24 | M/s Bhel Limited | Design, Supply, I&C of 66KV switchyard and Laying of Underground Cables for GSFC 10MW Charanka SPV Project | 212.67 | 22.09.2018 | Work under Progress |
25 | The Chief Engineer (P) Gujarat Energy Transmission Corporation Limited – Baroda |
Work for Supply, Erection, Testing & commissioning of 66 KV D/C Dhrangda – Virpar (Sauni Yojana – Und Dam -1) line on D/C Panther Tower with ACSR Dog Conductor – 19.80 Km on Turnkey Basis | 508.15 | 22.10.2018 | Work under Progress |
26 | M/s Simense Gamesa Renewable Power Private Limited | Erection, Testing and Commissioning of 220/33 KV, 2 X 150MVA Pooling Substation at Bhujpul – I Gujarat as per specification including Civil job on Turnkey basis. | 1036.53 | 10.01.2019 | Work under Progress |
27 | M/s Adani Green Energy (MP) Limited | Design, Engineering, Manufacturing, assembly, Inspection and Testing at works, packing & Forwarding/Dispatch, Transportation with transit insurance charges on F.O.R site basis for 33KV Double Circuit line Package for 252MW SECI # III Dayapar Wind Power Project, Kutch, Gujarat. | 13.82 | 27.03.2019 | Work under Progress |
28 | M/s Adani Green Energy (MP) Limited | Design, Engineering, Manufacturing, assembly, Inspection and Testing at works, packing & Forwarding/Dispatch, Transportation with transit insurance charges on F.O.R site basis for 33KV Multi Circuit line Package for 252MW SECI # III Dayapar Wind Power Project, Kutch, Gujarat. | 75.83 | 27.03.2019 | Work under Progress |
29 | M/s Simense Gamesa Renewable Power Private Limited | EHV line ROW Charges at Bhujpul site | 351.28 | 01.11.2018 | 15.01.2019 |
30 | M/s Simense Gamesa Renewable Power Private Limited | Right-of-Way clearance for SCOH Dog Line including Stay installation and Crop Compensation at Bhuvad |
97.00 | 17.10.2018 | Work under Progress |
31 | M/s Enerfra Projects (India) Pvt. Ltd.-Wind Farm Development-60 MW Client-ReNew Energy | Land Acquisition, PE Approval, Development of EHV Network.33 KV Network, Road Development. | Item Base rate | 01.05.2018 | Work under Progress |
32 | M/s Enerfra Projects (India) Pvt. Ltd.-Wind Farm Development-1000 MW+ | Order for Co-Ordination with utility/Nodal Agency/Any other Govt.Bodies to establish proposed 1000 MW+ wind power projects Site at Lakhpat ,Bhuj in Gujarat State | Item base rate | 01.04.2017 | WIP |
33 | M/s Enerfra Projects (India) Pvt. Ltd.-Wind Farm Development-300 MW+ | Order for Co-Ordination with utility/Nodal Agency/Any other Govt.Bodies to establish proposed 300 MW wind power projects aite at Lakhpat ,Bhuj in Gujarat State | Item base rate | 01.04.2018 | WIP |
34 | M/s.Mytrah Energy India Limited- Wind Farm Development – 800 MW + | MoM execute for Co-Ordination with utility/Nodal Agency/Any other Govt.Bodies to establish proposed 800 MW+ wind power projects in the Gujarat State | Item base rate | 27.02.2018 | WIP |
35 | M/s.Mytrah Energy India Limited – Wind Farm Development-120 MW EPC | Land Acquisition, PE Approval, Development of EHV Network , | Item base rate | 01.03.2018 | WIP |
36 | M/s Enerfra Projects (India) Pvt. Ltd.-Wind Farm Development-197.5MW Client-Spring Energy | Land Acquisition, PE Approval, Development of EHV Network. | Item base rate | 10.07.2017 | WIP |
37 | M/s Enerfra Projects (India) Pvt. Ltd.-Wind Farm Development-60 MW Client-ReNew Energy | Land Acquisition, PE Approval, Development of EHV Network.33 KV Network, Road Development. | Item base rate | 01.05.2018 | WIP |
38 | Inox Wind Infrastructure Services Ltd | Contract for Construction of roads / pathways / Platform for 50MW ( 25 X 2 MW ) wind power project at Surendranagar | 156.35 | 08.09.2010 | 15.07.2011 |
39 | Leo Duct Engineering & Consultant Ltd | Pile Foundation Work and Road Construction | 337.74 | 15.08.2012 | 18.05.2013 |
40 | Inox Wind Infrastructure Services Ltd | Construction work of WTG foundation for 2 MW wind power project at Chotila ( gujarat ) | 192.03 | 26.07.2014 | 30.05.2015 |
41 | Inox Wind Infrastructure Services Ltd | Construction work of Road / Pathways / Platform for 2 MW wind Power project at Chotila | 120.14 | 26.07.2014 | 30.05.2015 |
42 | Inox Wind Infrastructure Services Ltd | Supply of Consruction materials for 2 MW WTG wind power project. At Chotila | 117.56 | 29.07.2014 | 30.05.2015 |
43 | Inox Wind Infrastructure Services Ltd | Contract for supply construction materials for 2.00 MW WTG wind power project. | 196.92 | 02.12.2014 | 15.06.2015 |
44 | Inox Wind Infrastructure Services Ltd | To render service for construction scope include to complete foundation work for DF 2000 WTG foundation. | 251.12 | 02.12.2014 | 02.12.2015 |
45 | Inox Wind Infrastructure Services Ltd | Construction of roads/ Pathways/ Platform for 2 MW wind power project. | 113.58 | 13.11.2014 | 20.06.2015 |
46 | Gamesa Renewable Pvt. Ltd | Construction Work of WTG foundation at Raipar | 347.87 | 30.01.2017 | 01.05.2017 |
47 | Siemens Gamesa Renewable Power Pvt. Ltd. | G 114 8 wall 40 SBC Foundation Concrete Material Supply work at Zalki ( Karnataka ) | 260.19 | 03.01.2018 | 01.04.2018 |
48 | Siemens Gamesa Renewable Power Pvt. Ltd. | Labour Charges for 40 SBC Foundation 8 wall at Zalki WF ( Karnataka ) | 111.51 | 17.01.2018 | 01.04.2018 |
49 | Siemens Gamesa Renewable Power Pvt. Ltd. | Back filling , Excavation & Miscellaneous work at Zalki site ( Karnataka ) | 78.00 | 03.01.2018 | 01.04.2018 |
50 | Siemens Gamesa Renewable Power Pvt. Ltd. | MMS Pilling work – Marking & Drilling for NLC SPP at Tamilnadu | 21.47 | 15.10.2017 | 01.03.2018 |
51 | Siemens Gamesa Renewable Power Pvt. Ltd. | MMS Pilling work – Marking & Drilling for Ampsolar SPP at Karnatak | 24.29 | 13.10.2017 | 01.03.2018 |
52 | Siemens Gamesa Renewable Power Pvt. Ltd. | Construction work of Invertor room – Hunur | 24.00 | 13.10.2017 | 01.03.2018 |
53 | Siemens Gamesa Renewable Power Pvt. Ltd. | Providing Privet Land for WTG with NA complete ( at Bhuvad ) | 684.40 | 27.06.2018 | 30.12.2018 |
54 | Siemens Gamesa Renewable Power Pvt. Ltd. | Supply of Materials for Foundation work as per 40 SBC GP329310 R4 Dwg.
At Bhuvad (Kutch ) |
521.26 | 13.07.2018 | 25.01.2019 |
55 | Siemens Gamesa Renewable Power Pvt. Ltd. | Labour Charges for Foundation Work as per 40SBC GP329310 R4 DWG at Bhuvad |
223.39 | 13.07.2018 | 25.01.2019 |
56 | Siemens Gamesa Renewable Power Pvt. Ltd. | Purchasing of Sub station Land & Development for WTG work. | 362.61 | 09.08.2018 | Under Progress ( 70% Completed ) |
57 | Siemens Gamesa Renewable Power Pvt. Ltd. | CD Culvert and Drainage Filling work as per gamesa Specification at Bhujbul WF |
125.08 | 27.08.2018 | 15.12.2018 |
58 | Siemens Gamesa Renewable Power Pvt. Ltd. | EHV line ROW Charges at Bhujpul site | 351.28 | 01.11.2018 | 15.01.2019 |
59 | Siemens Gamesa Renewable Power Pvt. Ltd. | Providing Privet Land for WTG with NA complete ( Phase II ) at Bhuvad | 684.40 | 24.12.2018 | Under Progress ( 70% Completed ) |
60 | Siemens Gamesa Renewable Power Pvt. Ltd. | Clearing ROW for Pathway & WTG Location for initiating Civil foundation Works at Bhuvad |
283.20 | 14.06.2018 | Under Progress ( 95% Completed ) |
61 | Siemens Gamesa Renewable Power Pvt. Ltd. | Formation of Normal Soil & Murrum Road Work (5 mtrs width and 200mm thick) Dozing & Compaction as per Gamesa Specification at Bhuvad |
56.05 | 05.10.2018 | 15.12.2018 |
62 | Siemens Gamesa Renewable Power Pvt. Ltd. | Right-of-Way clearance for SCOH Dog Line including Stay installation and Crop Compensation at Bhuvad |
97.00 | 17.10.2018 | Under Progress ( 70% Completed ) |
63 | Enerfra India Privet Ltd | Construction Work of WTG forundation 2.5 MW at Kolithad | 677.32 | 24.11.2018 | Under Progress ( 70% Completed ) |
64 | Enerfra India Pvt Ltd | Clearing ROW for Pathway & WTG Location for initiating Civil foundation Works at Bhuvad |
168.00 | 24.11.2018 | Under Progress ( 70% Completed ) |
65 | Inox Wind Infrastructure Services Ltd | Construction Work of WTG foundation at Dayapar ( Kutch ) | 407.00 | 11.09.2018 | Under Progress |
66 | Siemens Gamesa Renewable Power Pvt. Ltd. | Supply of Materials for Foundation Work Construction of 8 wall foundation G122-T127 SBC-40 drawing GP434107 RO at Bhujpul |
196.00 | 16-05-19 | In Progress ( 30 % Completed ) |
67 | Siemens Gamesa Renewable Power Pvt. Ltd. | Service for Foundation Work Construction of 8 wall foundation G122-T127 SBC-40 drawing GP434107 RO at Bhujbul | 99.00 | 16-05-19 | In Progress ( 30 % Completed ) |
68 | Siemens Gamesa Renewable Power Pvt. Ltd. | Land Aggregation Upon signing of Agreement at Bhujbul Semcorp Mandavi WF – Per locations | 400.00 | 11-03-19 | Completed |
69 | Siemens Gamesa Renewable Power Pvt. Ltd. | Land Development & Approvals Sale deed /GPA in favour of Developer or its representative at Bhujbul Semcorp Mandavi WF – Per locations | 200.00 | 11-03-19 | Completed |
70 | Siemens Gamesa Renewable Power Pvt. Ltd. | EHV Line Row Charges at Bhujpul | 87.00 | 03-05-19 | Completed |
71 | Suzlon Energy Ltd. | Survey & Identify WTG Location, Preparation of Land Application and Receipt of invert copy and Processing fees for Subapura, Dist. Patan 50 MW Project. | 900.00 | 12-08-16 | 15-08-17 |
72 | Suzlon Energy Ltd. | Survey & Identify WTG Location, Preparation of Land Application and Receipt of invert copy and Processing fees for Sadala, Dist. Morvi 38 MW Project. | 500.00 | 30-03-17 | 01-08-18 |
73 | RENEW POWER VENTURE PVT. LTD. | Work order for Plane Table Survey, Micro siting of 400 MW wind Power Project at Bhuvad Kutch, GJ. | 20.00 | 21-11-16 | 31-05-17 |
74 | Regen Power Tech PVT. LTD. | Land Acquisition and Boundary Wall Demarcation with necessary survey Equipments for Vejalpur (16 WTG) and Khareda (17 WTG) site in Gujarat. | 11.49 | 05-07-16 | 29-07-16 |
75 | Regen Power Tech PVT. LTD. | Land Acquisition and Boundary Wall Demarcation with necessary survey Equipments for Vejalpur (10 WTG) site in Gujarat. | 10.00 | 30-01-17 | 30-03-17 |
76 | Rashi Design Solution Private limited for WAPCOS Limited |
Gramthan Property Survey & Mapping Project for 10,000 Housing Properties. | 6.00 | 06-05-16 | 23-08-16 |
77 | Rashi Design Solution Private limited for WAPCOS Limited |
Gramthan Property Survey & Mapping Project for 20,000 Housing Properties. | 12.00 | 25-03-16 | 25-05-16 |
78 | Department of Forest, Wild ass Sanctuary, Dhrangdhra. | Work order for Wild Ass Sanctuary Boundary demarcation in term of BCRLI project for 500 Running KM Area. | 21.75 | 15-12-18 | 31-12-18 |
79 | Department of Forest, Wild ass Sanctuary, Dhrangdhra. | Work order for Installation of 1000 Nos., 1 Meter Heighted Wild Ass Sanctuary Boundary PCC Round Pillar in term of BCRLI project. | 30.00 | 02-02-19 | Under Progress |
80 | EN Aaski Windfarms Private Limited for RENEW POWER VENTURE PVT. LTD. |
Land application to Land allotment work for 35.7 MW Kagvad Project. | 150.00 | 17-03-18 | 27-12-18 |
81 | Sprng Energy Pvt. Ltd | Work Order for identify and micro sitting for 1100 WTG location in Various Sites in Gujarat. | 17.00 | 05-09-17 | Under Progress |
82 | Sprng Energy Pvt. Ltd | Installation of 145 meter heighted Asia Pacific Tallest Wind Mast for 8 nos. location in Gujarat State Various area for collection of wind data and study Including of Land Acquisition and Land Allotment on Rent Agreement basis. | Item Rate | 25-12-18 | Completed |
83 | GE Renewable Private Limited | Installation of 165 meter heighted Asia Pacific Tallest Wind Mast for 2 nos. location in Devbhumi Dwarka, Gujarat for collection of wind data and study Including of Land Acquisition and Land Allotment on Rent Agreement basis. | Item Rate | 25-12-18 | Completed |
84 | Senvion Wind Technology | 275 WTG Location Survey For Construction Feasibility at Dharampur (132 WTG) & Kutch (143 WTG) Projects. | 13.75 | 15-11-18 | 22-12-18 |
85 | Powerica Limited | FCA Application at Jangi for Wind Turbing Purpose, Forest Conservator Act 1980 under Forest application (JW01) | 2.5 | 03-05-19 | Under Progress |